A. Applicability. The following Transportation Mitigation Plan applies to all development within the Petrosa Master Planned District. The Transportation Mitigation Plan is adopted and implemented pursuant to BDC 4.7.600(D)(1).

B. Alternate Transportation Design Standards. Transportation facilities within the Petrosa Master Planned District must comply with the standards set forth in BDC 2.7.3970 and Figure 2.7.3970.

C. Transportation Mitigation. The following transportation mitigation measures must be constructed pursuant to the deadlines set forth in Table 2.7.3980 below.

Table 2.7.3980. 

Mitigation Requirements

Trigger

Construct frontage improvements and dedicate right-of-way with each RS and RM residential phase, RH developments and commercial developments.

Prior to final plat of the RS and RM residential phases and prior to occupancy of the first building of the RH and commercial developments.

If RH-1 develops prior to Residential Phase 6, the future Yeoman Road frontage improvements along RH-1 must be bonded for and constructed with Residential Phase 6.

Construct a single-lane roundabout at the intersection of Butler Market Road and Deschutes Market Road.

Prior to final plat of 1st residential phase or occupancy of 1st building of RH developments or commercial developments, whichever comes first.

Dedicated right-of-way for the roundabout at the intersection of Butler Market and Eagle Road.

Prior to final plat of Residential Phase 1.

Realign Eagle Road with the southern approach. Construct a westbound left-turn lane bay on Butler Market Road and install stop sign control on north-south approaches, if a roundabout is not previously constructed.

Prior to final plat of Residential Phase 1.

Coordinate with BPRD and construct a multi-use pathway along the NUID canal frontage of each abutting phase.

Prior to final plat of Residential Phase 1, 3, 4 and 6.

Construct an enhanced pedestrian crossing with a raised median south of the southernmost proposed driveway location along Deschutes Market Road.

Prior to occupancy of the first building of RH-1.

Dedicate right-of-way for a future roundabout at the Deschutes Market Road and Yeoman Road intersection.

Provide a slope easement along Yeoman Road for the future Yeoman extension bridge.

Construct a secondary fire access to Deschutes Market Road.

Prior to final plat of a Residential Phase, if a Residential Phase precedes the commercial site.

Construct a single-lane roundabout at the intersection of Butler Market Road and Eagle Road.

Prior to final plat of Residential Phase 2 or prior to the 325th northern p.m. peak hour trip, whichever comes first.

Establish an enhanced pedestrian crossing for the future school and trail system across Eagle Road.

Prior to final plat of Residential Phase 4.

Install left-turn lane on Butler Market Road at new intersection and extend eastward the multi-use pathway on Petrosa Avenue.

Prior to final plat of Residential Phase 5.

Extend Yeoman Road, including a multi-use pathway, from Deschutes Market Road to Eagle Road.

Prior to final plat of Residential Phase 6 and if not already complete.

Accommodate a multi-use trail crossing the southern Deschutes Market Road / Yeoman Road roundabout approach.

Construct Eagle Road to Yeoman Road.

Provide right-of-way for a future roundabout at the Eagle Road and Yeoman Road intersection.

Construct the NUID Canal bridge crossing, east of Deschutes Market Road.

Prior to final plat of Residential Phase 6 or Phase 7 or prior to occupancy of the school, whichever occurs first.

Construct a single-lane roundabout at the intersection of Deschutes Market Road and Yeoman Road.

Prior to final plat of Residential Phase 6 or Phase 7, or prior to occupancy of the school or prior to the 335th Phased (Phases 1 – 8) housing unit, whichever comes first.

Construct Yeoman Road from Deschutes Market Road to and through the school frontage.

Prior to occupancy of the school if prior to final plat of Residential Phase 6.

Construct Eagle Road to Yeoman Road.

Prior to occupancy of the school if the school develops prior to final plat of any of the residential phases along future Eagle Road.

Construct Yeoman Road from Purcell Boulevard to 18th Street to a modified City of Bend collector standard cross-section per the Petrosa Annexation Agreement (2020-11217) if not funded through a capital project.

Prior to final plat of Residential Phase 6 or Phase 7, or prior to occupancy of the school or prior to the 335th Phased (Phases 1 – 8) housing unit, whichever comes first.

Construct stop controlled intersection improvements at Yeoman Road and 18th Street.

Extend Yeoman Road from Deschutes Market Road to Butler Market Road.

Prior to final plat of Residential Phase 7 and if not already complete.

Construct a multi-use pathway from Deschutes Market Road to Butler Market Road.

Reconfigure the Butler Market Road and Yeoman Road intersection by adding eastbound and westbound left-turn lanes.

Provide right-of-way for a future roundabout at the Butler Market Road and Yeoman Road intersection.

Modify control and/or reconfigure the Butler Market Road and Hamby Road intersection to only stop eastbound travel.

Provide a Cascades East Transit stop along the southern commercial frontage along Butler Market Road.

Prior to occupancy of the first building of the commercial development.

Construct an enhanced pedestrian crossing on Deschutes Market Road south of the existing Deschutes Market Road bridge.

Construct sidewalks from the Butler Market Road and Deschutes Market intersection to the Butler Market Road and NE 27th Street intersection to complete the sidewalk system and provide area connections to the retail area and the future elementary school.

Install school speed zone signs in accordance with the MUTCD and City of Bend Standards and Specifications.

Prior to occupancy of the school.

Extend the east-west multi-use pathway along the southern and western school frontages.

Construct Yeoman Road to and through from Deschutes Market Road to the eastern property line.

Construct Eagle Road to Yeoman Road.

Provide right-of-way for a future roundabout at the Eagle Road and Yeoman Road intersection.

Reconstruct all County roads that are on site and contiguous to the properties to City of Bend Standards and Specifications as each phase of each property develops per BDC 4.9.600(A)(8).

General Requirement.

Construct all local and higher classification streets, private or public, to City of Bend Standards and Specifications as each phase of each property develops.

General Requirement.

Construct Eagle Road to modified City of Bend Collector standards with a multi-use pathway on the east side per BDC 2.7.3790.

General Requirement.

Construct Yeoman Road to a modified City of Bend Collector standard cross-section per BDC 2.7.3790.

General Requirement.

Provide a secondary emergency access at each residential phase.

General Requirement.

All property owners must pay the Transportation System Development Charge (TSDC) assessed by the City at the time of development.

General Requirement.

[Ord. NS-2407, 2021; Ord. NS-2363, 2020]