Skip to main content
Loading…
This section is included in your selections.

Appropriate erosion and sediment control devices, and measures and devices to prevent and control other construction site pollutants, shall be in place prior to the start of and as part of construction activity on all private or public lands requiring a permit as part of this section, unless specifically exempted by the City, so that the performance standards of the erosion and sediment control chapter of the COSM and as follows are met.

A. Additional ESC Performance Standards.

1. Once permanent ESC have been effectively established and temporary ESC and pollution prevention measures are no longer needed, temporary measures and materials (e.g., silt fences, inlet protection devices, etc.) shall be removed and properly disposed of. [Ord. NS-2176, 2012]