Skip to main content
Loading…
This section is included in your selections.

A. Storm Drainage Improvements Required. Storm drainage facilities shall be depicted on City-approved engineered construction drawings and installed to serve each new development in accordance with applicable City construction specifications as described in the City of Bend Standards and Specifications and BC Title 16, Grading, Excavation, and Stormwater Management.

B. Accommodation of Upstream Drainage. Drainage facilities shall be designed and constructed to accommodate increased runoff so that discharge rates existing before the proposed development shall not be increased, and accelerated channel erosion will not occur as a result of the proposed land disturbance or development activity. Such facilities shall be subject to review and approval by the City Engineer.

C. Effect on Downstream Drainage. Where it is anticipated by the City Engineer that the additional runoff resulting from the development will overload an existing drainage facility, the City shall withhold approval of the development until provisions have been made for improvement of the potential condition or until provisions have been made for management of additional runoff caused by the development in accordance with City of Bend Standards and Specifications. Drainage shall not be directed to an existing watercourse, channel, stream or canal. Storm drainage facilities shall comply with applicable State and Federal regulatory requirements.

D. Easements for Existing Watercourses. Where an existing watercourse traverses a development, such as a natural watercourse, drainage way, channel or stream, or any other existing drainage facility including but not limited to irrigation canals, laterals and associated ditches, there shall be provided and recorded an easement conforming substantially with the lines of such existing watercourses and such further width as will be adequate for conveyance and maintenance, as determined by the City Engineer.

E. Easements for Developed Drainage Facilities. Where new drainage facilities are provided that include elements located outside the dedicated public right-of-way, such facilities shall be located within an area provided for in a recorded easement. The easement shall be adequate for conveyance and maintenance as determined by the City Engineer. [Ord. NS-2229, 2014; Order No. 2012-01, 2012; Ord. NS-2016, 2006]