Skip to main content
Loading…
This section is included in your selections.

In addition to the submittal requirements of BDC Chapter 4.2, the Site Plan Review application shall provide the following:

A. A reclamation plan, which meets the guidelines and in a format established by Department of Geology and Mineral Industries (DOGAMI).

B. A maintenance program. All buildings, structures and equipment used for the production and processing of minerals and other materials affected by this title shall be maintained in such a manner as to assure that such buildings, structures and equipment will not become dilapidated or hazardous. The reclamation plan shall also address disposition of buildings, structures and equipment used in production and processing of minerals and other materials, offices, storage garage and watchman’s house or any remains of any structures and equipment.

C. Air, water and noise requirements. Air and water quality and noise level shall be in accordance with the requirements of State and Federal laws and regulations and City codes.

D. A complete description of all planned uses.

E. The Community and Economic Development Director may require the following at the time of Site Plan Review approval:

1. An increase or decrease in required setbacks.

2. Screening of the proposed use, or parts thereof, by fencing or landscaping.

3. Limitations on lighting.

4. An adequate plan for phased mining and reclamation of the site.

5. Restrictions on the hours, days and noise levels of operation.

6. Dust-free site access roads near residential areas.

7. Adequate water supplies to enable landscaping reclamation and dust control conditions are to be met. [Ord. NS-2445, 2022; Ord. NS-2251, 2015; Ord. NS-2195, 2013; Ord. NS-2016, 2006]